This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
en:tips:stok_ve_maliyet_sistemi [2012/05/04 06:27] Samba Admin |
en:tips:stok_ve_maliyet_sistemi [2012/09/07 09:30] (current) |
||
|---|---|---|---|
| Line 72: | Line 72: | ||
| Finally this is the cost report for the work period. The cost of everything is $18. If you include multiple work periods in this report you'll see the average cost. | Finally this is the cost report for the work period. The cost of everything is $18. If you include multiple work periods in this report you'll see the average cost. | ||
| - | Visit this topic for more conversation about this topic. | + | You can visit our forum for your questions about this topic. |
| http://forum2.sambapos.com/index.php/topic,526.0.html | http://forum2.sambapos.com/index.php/topic,526.0.html | ||